CONCRETE:
Pier Holes and Reinforcement
Grade Beams and Footings
Floor Slabs
Tilt Walls
Sidewalks, Driveways, Flatwork
Firelanes
PLUMBING:
All Rough-ins, with pipes through beams or foundationwalls sleeved.
Water & Sewer Yardlines and Taps
Grease Traps, Sand Traps, Interceptors
Top Out or Stack Out
Gas Line Installation & Test
Final
ELECTRICAL:
Temporary Service
Underground Conduit and Rough-in
Wall & Ceiling Rough-ins
Meter Base Service Upgrades & Grounding
Conduit
Firestopping
Final
MECHANICAL:
HVAC Rough-in, access & Ductwork
Fire Dampers & Smoke Detector Systems
Commercial Vent Hoods and Suppression System
Final
STRUCTURAL:
Framing, to include Main Wind Force Resistance System Fasteners, to include Welding Floor Joists and Rafter Systems, to include Engineered Wood Certifications
Headers and Gluelam Beam Certification
Truss Certifications
Firewalls and Firestopping
SITE:
Setbacks and Specific requirements relating to the
particular site, such as I-35 regulations.
Landscaping requirements.
It is the responsibility of the General Contractor to assure that he notifies the Inspection Department that work has progressed to a stage requiring an inspection. The work must be inspected prior to being covered or concealed. The Inspection Department requires a minimum of 4 hours notice for an inspection at this time. |